Posts

Showing posts from November, 2021

Material valuation

Stock posting Revaluation postings Negative stocks Price differences and exchange rate differences Transfer postings  Determination of the clearing entry during goods receipt for a purchase order Determination of the debit entry of a goods receipt for a purchase order item with account assignment Determination of the credit posting to order during a goods receipt for a production order Stock posting Value of the goods movement : With the majority of goods movements, a corresponding value flow is specified with the quantity flow . This goods movement value generally corresponds to the value from the stock posting (e.g. for consumptions) ; however, the value can also be determined via a purchase order price ( goods receipt for purchase order ), originate from the plan credit of a production order (g oods receipt for production order ) or simply be specified externally as a local currency amount (e.g. for a baseline inventory at the time of production startup ). For materials control...

Controlling

Image
Price change Release future price Basic knowledge  Additional information 1925393 - The priority to release the standard price Price change Release future price  Use the program SAPRCKM_PRCH. 746064 - CKME: Material master change document incomplete When you release planned price changes by using Transaction CKME (Report SAPRCKM_PRCH), the system only saves the change of the current valuation price in the material master change document. By mistake, the system does not document the resetting of the 'Future price' (MBEW-ZKPRS) field and the 'Valid from' (MBEW-ZKDAT) field to initial values in the material master change document (see Transaction MM04). Wichtige Strukturelemente Gemeinkosten-Controlling (CO-OM) (1) Kosten- und Erlösartenrechnung  (2) Kostenstellenrechnung  (3) Prozesskostenrechnung  (4) Gemeinkostenaufträge und -projekte  (5) Informationssystem  Produktkosten-Controlling (CO-PC) (1) Produktkalkulation  (2) Kostenträgerrechnung...