Learning path to Production planning
Organizational Structures
- Plant
- Storage location
- MRP controller: it is assigned to a material master
- Capacity planner: it should evaluate work center capacity. It is assigned to a work center header
- Production scheduler: Plant level, assignment to the production schedule profile.
- A production scheduling profile to a:
- Material (Work Scheduling screen in material master)
- Production supervisor (Customizing)
- Calendar, Factory calendar
Master data
Material master
Material types: FERT
Bill of a material
- BOM usage,
- Material types allowed for a header and for a component level.
- BOM status
- History req. for BOM
- Item category in BOM
- Stock item, Non-stock ( to be procured externally ), Variable size, Text item, Intra material ( temp. usage in process industry )
- BOM explosion type
- BOM selection ( OS31: Production, then Sales ... )
Work center
- Work center category ( OP40 ): Link to the production type
- Field selection
- Standard value key
- Parameter - Formula - Work center
- Location group: group work centers by place, transport time matrix
- Control key: which functions..
Routing
Set of operations (OPEB)