Learning path to Quality management

  • Total Quality Management 
    • ISO 9001 requirements
  • SAP S/4HANA Quality Mgmt. Processes
  • Quality planning
  • Master data management
  • Production
  • DMS data
  • QM
  • Quality Inspection
  • Available features
  • Quality certificates
    • Incoming Quality certificate (procurement)
    • Outgoing Quality certificate
  • Quality notification
    • Quality notification tools 
  • Audit management
  • Stability study  
  • QM workflow tools 
    • Batch management 
    • Recurring inspection and expiration date
    • Active Ingredient management 
  • Quality Management in Logistics
    • Procurement
    • Inventory management 
    • Quality Management in Production planning
    • Quality management in Sales 
    • Integrating QM in EWM
  • Sample management
    • Configuration for Sample management
    • Master data
    • Business process 
  • Stability Study for a Material
  • Failure Mode and Effects Analysis and Control Plan 
  • Monitoring and evaluation 
  • QM in logistics 
    • Quality planning
    • Quality inspection
    • Result recording 
    • Inspection lot origin
    • Quality certificates
    • Quality notifications
    • Defects recording

Total Quality Management 

"Total Quality Management (TQM) is a management technique based on the idea that all “employees continuously improve their ability to provide on-demand products and services that customers will find of particular value."   Total Quality: A User’s Guide for Implementation

Here are the main principles of TQM
  1. Customer focus ( Listen to the Voice of the Customer )
  2. Total employee commitment
  3. Process approach
  4. Integrated system
  5. Continual improvement
  6. Fact-based decision-making
  7. Communications

ISO 9001 requirements

  1. Capability and training: necessary qualifications must be attained and records on training status must be maintained (HCM).
  2. Evaluating contractual requirements (DMS).
  3. Development and phase planning (PS, PLM).
  4. Vendors must be evaluated, and procurement specifications must describe requirements adequately.
  5. Controlling production and services (PP: Routing).
  6. Identification and traceability.
  7. Property of the customer (products provided).
  8. Control of monitoring and test equipment.
  9. Internal audit.
  10. Improvements (corrective and preventive measures).

SAP S/4HANA Quality Mgmt. Processes

Planned processes or by event controlled?

What are the requirements for Quality management? 
  • This comes from industry-specific standards ( like VDA, FDA, GMP ( goods manufacturing practices)) .

Quality planning

  1. Master data management (material master, catalogs, selected sets, master inspection characteristics, class characteristics, inspection methods, sampling procedures, sampling schemes, dynamic modification rules, sample-drawing procedures, QM work centers).
    • QS21: Master inspection characteristics ( physcial property to be checked )
  2. Inspection planning  (define inspection criteria as material to be inspected, how the inspection is to take place, characteristics to be inspected, required test equipment, work center and inspection specifications
    1. inspection plans ( define inspection characteristics, their assignment to inspection operations and the test equipment to be used
    2. reference operation sets, 
    3. material specifications.
      • Options:
        • Material Specification with Class Characteristics
        • Material Specification Without Class Characteristics
      • Transfer the results of the quality inspection to the batch classification , if the master inspection characteristic is linked to a class characteristic
    • An inspection plan or material specification is not mandatory for QM inspection lot creation
    • When an inspection lot is created, the system copies the master inspection characteristics from the inspection plan and material specification into the inspection lot
  3. Control mechanisms for:
    • Quality inspections (for example, inspection setup, QM-specific data in the material master, QM order, batch management, serial number processing).
    • QM in procurement (for example, quality info record in procurement, quality assurance agreements in procurement).
    • QM in production (for example, inspecting by batch, serial number processing, inspection of variant products).
    • QM in Sales and Distribution (for example quality info record in sales, quality assurance agreements in sales, technical delivery terms).

Master data management

Materials management
  • Material master (Inspection control)
    • QM authorization (user groups)
    • GR processing time to process inspection lot (working days)
    • Catalog profile  ( defects list and locations)
    • Inspection interval ( repeat inspection for a batch )
  • Change master record (Material master, inspection plan, Quality info record)
  • The business partner (inspection plan)
    • Set a lock with the quality reason
  • Batch master record (Results recording )
    • SLED, next inspection date 

Production

  • Routing, reference operation set, rate routing, master recipe (inspection plan, quality notification)
  • Work centers (inspection plan, quality notification) for quality inspection
  • Production resources/tools (PRT)
    • Assign PRTs to operations and inspection characteristics of a task list 

DMS data

  • Quality documents
    • Quality assurance with vendors (Transaction QV01) 
    • Quality assurance with customers (Transaction QV21)
    • Technical delivery terms (Transaction QV31)
  • Inspection method for information or instruction (Transaction QS31)

QM

  • Catalogs (inspection plan, quality notification)
  • Inspection type assigned to a material master object 
  • Sampling procedure ( Transaction QDV1 )
    • Size: Fixed sample, 100% inspection, using the schema, sample percentage, 
    • Valuation mode: accept or reject inspection characteristics 
  • Basic quality and inspection planning data 
  • Master inspection characteristics (inspection plan), Transaction QS21
    • Quantitative and qualitative 
    • Control settings 
    • Assign the catalog type 
  • Reference operation set (inspection plan)
  • Inspection plan /routing ( procurement, production, sales ), Transaction QP01
    • production-based task list type 
      • Tasklist header
        • Operation
          • Inspection characteristics 
          • Test equipment 
  • Material specification ( material master, not plant-specific  ), Transaction QS61
  • Quality info record ( procurement, sales ), Link to DMS documents
    • Procurement
      • Inspection control
        • Delivery quantity released for a vendor
        • The date to for releases 
        • List of quality documents to be used 
        • Whether QM documents are exchanged via EDI
        • Lead time 
      • Source inspection - No GR ( the inspection will be at the vendor's side )
      • Status profile 
    • Sales 
      • When and how the inspection lot takes place
      • What documents are relevant for a delivery 

Quality Inspection

Available features

  • Replace Inspection characteristics or inspection method ( QS27 )
  • List Inspection characteristics ( QS28)
  • Delete inspection plan ( CA98)
  • Inspection lot
    • Cancel inspection lot ( QA02)
    • Block temporarily inspection lot (QA02)
    • List inspection lots with outstanding quantities ( QVM2)
  • Digital signature ( Cross applications component: used in inspection lot approval, results in recording, usage decision, physical sample drawing )
    • Define authorization groups
    • Define individual signatures, then assign it to the authorization groups
    • Define a signature strategy that defines the sequence and flow of individual signatures and maintains the predecessor-successor relationship.
      • with a user and password
      • external security product
    • Authorization groups for QM master data ( and assign to the strategy)
    • Signature method
    • Assign it the materials
    • Digital signature logs are available (QEDS)
  • Result recording
    • Copy inspection results of Inspection lot
    • Copy Inspection results into Batch classification ( fill characteristics of a batch )
  • Usage decision
    • Collective usage decision (AQ16)
    • Automatic UD (QA10, SKIP status): planned time gap, Automatic UD checkbox,
    • Reset UD (QA12)
    • Reverse stock posting ( exit: QEVA0008)
  • Engineering Workbench (CWBQM): change Inspection plans and Task lists.
  • Multiple specifications ( use different limits for various vendors and customers in the same inspection plan!)
  • Dynamic modification rule ( skip a predefined number of inspection lots for results recording and ask a user to enter only a usage decision for the inspection lots )

Configuration

  • Client level
    • Replace master insp. characteristics ( inspection plan and material specification )
    • Replace inspection method ( inspection plan and material specification )
    • Multiple specifications
    • ALE settings
    • BOM usage for QM integration
  • Plant: Basic data, Insp. lot creation, Results recording, Insp.lot completion, General settings, Visual planning

Quality certificates

Quality certificates help to validate a product conforms to predefined specifications.
  • In the QM (Quality Management) component for the inspection lot
  • In the MM (Materials Management) component for a batch
  • In the SD (Sales and Distribution) component for a delivery

Incoming Quality certificate (procurement)

QM in procurement: Define control key (0005) is to allow or disallow business operations
  • Release ( quality info record must be created ) and Cert. required 
Material master 
  • QM proc. is active
  • Assign a certification type (0008) to a material master 
  • QM control key 
Quality information record 
Inspection active 

Process
  • Create a PO, GR (a pop up about a certificate) 
  • QS51: create an incoming quality certificate and set the status 
  • QC55: Incoming certificate worklist 
    • Check the allowed period
    • Send a reminder 

Outgoing Quality certificate

Prerequisites
  • QC01: Certificate profile  (E23C), assign materials for data origin and inspection types
  • Assign master inspection characteristics to the profile 
  • QC15: Assign the profile to ...
Process
  • Creating a manual inspection lot
  • Results recording 
  • Usage decision
  • QC21: Creation of the outgoing quality certificate 
    • with the reference to a delivery, batch, inspection lot

Quality notification

The aim of the quality notification should be to form a business workflow across several specialist departments. 

Quality notifications
  • F1: Customer-related defect (QM notification in Sales) 
    • Reference to Customer, material sales order, Sales area, delivery note
    • Process ( QM01 is to create a QM notification, Select a QM notification type  )
      • Object 
        • Set the reference object 
        • Check all related QM notifications for the references
      • Subject 
        • As additional details, quantity, costs
      • Items
        • Causes: Defect ( we can enter a component of an assembly )
        • Correction tasks: task and status
        • Corrective actions:
      • Tasks
      • Activities 
      • Partner determination
  • F2: Supplier-related defect  (Quality notification in procurement)
    • Reference: GR document, material, vendor, purchasing org, inspection lot
  • F3: Material-related defect (QM notification in production)
    • Reference: Internal partner, material, production or process orders, work center, inspection lot
  • Q1: Customer complaint
  • Q2: Complaint against supplier
  • Q3: Internal problem
Quality notification
  • Partner
  • Defect item: activities, tasks, causes
  • Activities
  • Tasks

Quality notification tools 

  • QM11 Worklist 
  • QM19 Multilevel notification lists 
  • MCXV Key figures for material 
  • MCVZ Key figures for vendor 
  • ISO1 Solution database 
  • IS02 Solution database by index 

Audit management

Stability study  

QM workflow tools 

Batch management 

Recurring inspection and expiration date

The ability to inspect batch-managed goods, whether procured raw materials or produced semifinished or finished goods, before their expiration dates.
  • Inspection type 09 in the material master
  • Maintain the inspection interval 
  • Maintain SLED (max, min)
The Next expectation date is calculated for a batch using the Manufacturing date.
  • QA07 is for Deadline monitoring 
  • MB5L is for Shelf life list 

Active Ingredient management 

Prerequisites
  • Activate batch-specific material UoM-s
  • Create a UoM for proportional units (CUNI)
  • Create a batch-specific UoM
  • Maintain proportional factors ( BMA3 )
  • Define ration conversion 
  • Create a characteristic with the UoM  % and set char values
  • Assign this characteristic to the class ( batch )
  • Create master inspection characteristics (QS21)
  • Set the classification to the material master (MM02)
  • Add a UoM to additional data and maintain the conversion factor, proportional/prod unit
  • Choose Active ing. UoM as the Order unit in the purchasing view 
  • Set the valuation category X to evaluate the material at the batch level
  • Inspection type 01 
  • Select Insp with mat.spec.
  • Create a material specification ( QS61 ): assign the characteristics 
  • (optional) we can create a price for Batch with AI UoM (MWB1)
Process flow
  • Create a PO with AI UoM as PO unit
  • Goods receipt for PO 
  • The actual proportion is taken from the usage decision and compared to the planned quantity
  • Display the AI Valuation price ( MWB3 )
  • Inspection lot creation ( re-measure ) QE01 and during result recording set new % in  AI UoM
  • Usage decision 
  • Correct purchase order history (MWBQ) 
    • a new material document with the movement type 142
  • Invoice receipt only for actual ingredient ( proportion )

Quality Management in Logistics

Procurement

Inspection types
  • 01: Incoming inspection for GR for PO
    • Inspection lot is created after GR
    • Stock is posted into Quality stock until Usage decision 
    • Result recording & Usage decision
    • Stock posting
    • Post Invoice receipt 
    • Release Invoice receipt 
    • Prereq.; Inspection type is in the material master, Quality information record exists (QM control key )
    • Option: do not post accounting document at GR, then use the movement type 103 ( GR blocked ) and then 105 ( Release GR blocked)
  • 0101: Source inspection for GR for PO
    • Purchase order
    • Source inspection ( QI07, QA51 ) =>  QM inspection lot
    • Result recording  (QE11) & Usage decision (QA11)
    • Goods receipt of Source inspected materials 
    • Invoice receipt
  • 0102: GR, pilot run ( a new vendor )
    • Set the status profile ( then it is assigned to the inspection typeS )
    • PO, GR what triggers.. 
    • Inspection lot created for the first status
    • new PO/, GR what triggers.. 
    • Inspection lot creation for the next status dependent on the customizing 
  • 0130: GR from external procurement (subcontracting)
    • Subcontracting purchase order
    • Goods issue of components
    • Goods receipt
    • QM inspection lot
    • Invoice receipt 
Settings
  • assign a task list type to a material type
  • define a control key ( technical delivery terms/quality agreements are required to be uploaded in DMS, is Quality info. record is mandatory, should a vendor submit Quality certificate ?, block, block invoice before goods are inspected) 

Inventory management 

Inspection types
  • 05: Inspection for other goods receipts
    • GR without PO
  • 08: Stock transfer
    • Stock transport order
    • Goods issue
    • Goods receipt 
    • QM inspection lot
  • 0800: QM activation
    • Stock placed in QM stock must go under Quality inspection again to avoid inconsistency

Quality Management in Production planning

Inspection types
  • 02 Goods issue inspection
  • 03 In-process inspection for process order 
  • 04 Final inspection for R from production 
  • 13 In-process inspection for run schedule header 
Configuration
  • Assign the task list type to a material type
  • Order type-dependent plant parameters (COR4, OPL8 for discrete manufacturing)
  • Confirmation parameters for a process order 
  • Control key
    • Are the inspection characteristics required?
    • Is Automatic GR allowed? 
Master data 
  • Material master
  • BOM
  • Master recipe, rate routing, routing
    • Master recipe
      • Phase 
  • Production version 

Quality management in Sales 

Inspection types
  • 06 Inspection for customer returns
    • Create a return order 
    • Create an outbound delivery with the reference 
    • Inspection lot creation 
    • Results recording & usage decision
    • GR
    • Issue credit memo 
  • 10 Inspection for delivery to customers
    • Sales order
    • Outbound delivery 
    • QM inspection lot
    • Results recording & usage decision
    • Post GI
    • Billing 
  • 11 Inspection for delivery to customers (without order )
    • VL01NO
  • 12 General inspection for delivery 
Configuration
  • Assignment of inspection lot origin to the delivery type
  • Assignment of inspection type to delivery category 
Master data
  • Material master
  • Customer master
  • Material pricing condition 
  • QIR (Sales) QV51
    • Quality inspection: before/after delivery, by customer 

Integrating QM in EWM

Sample management

Configuration for Sample management

  • Plant settings:  enter container at GR ( recording is required ), Sample management schema 

Master data

QPV2 Sample drawing procedure ( is assigned to an inspection plan, master recipe, routing )
  • Primary sample: from a material/batch stock
  • Pooled sample: mixing other physical samples
  • Reserve sample: store for other inspections

Business process 

  • Purchase order
  • Goods receipt for PO, enter the container details ( number and UoM)
  • An inspection lot is created 
  • Confirm Sample withdraw
  • A physical sample is created: QRP4 release or confirm 
  • QPR5 Inspection lot is created for the physical samples
  • Result recording for the physical sample

QPR1: Manual creation of a physical sample 
Physical sample drawing with reference to production processes 

Stability Study for a Material

A stability study assesses and evaluates the physical and chemical conditions of a physical sample in various storage conditions.

For the stability study, inspection types 16 Inspection for Storage Condition, 1601 Initial Test (StabilitynStudies), and 1602  Manual Insp. Lot for Storage Cond is applicable.
  1. QST01 Create stability study: notification type QS, external notification/stability study number.
  2. Action: Create Initial Sample ( Sample condition, storage, quantity, text )
  3. Action: Confirm Initial Sample
  4. Action: Assign Bill of Material ( The stability study usage of a BOM has limited functions because material) 
  5. Action: Maintain Bill of Materials
  6. Action: Initial test inspection lot: the system creates an inspection lot and is of inspection type 1601
    • The master inspection characteristics are taken from the inspection plan that was previously available as a part of the QM master data
    • QE01: Results Recording and  QA11: Usage Decision
  7. Action: Complete Initial Test
  8. Action: Specify Storage Conditions
  9. Action: Store Stability Samples
    • QPR3: Create the physical sample number
  10. Action: Delete Storage Conditions
  11. Action: Create Testing Schedule
    • Create inspection lot on the date  
  12. Action: Complete Testing Schedule
  13. Action: Print Labels
  14. Action: Manual Inspection Lot for Storage Condition

Failure Mode and Effects Analysis and Control Plan 

FMEA ( Transaction QM_FMEA )

The tool with support to answer and evaluate with the following steps: 
  1. Review existing business processes: Examine how each component of the process functions and its relation to the other items
  2. List potential failure modes
  3. List the potential effects of failure.
  4. Assign severity rankings to each effect.
  5. Assign occurrence rankings to each cause.
  6. Assign rankings to failure detection.
  7. Calculate the RPN ( Risk Priority Number (RPN) = Severity × Occurrence × Detection; the higher the RPN, the greater the risk ).
  8. Develop an action plan to reduce RPN.
  9. Implement the action plan.
  10. Recalculate the resulting RPN.

Control plan ( Transaction QPCP )

A control plan is a specific and actionable plan to ensure product or process improvements, and it’s the direct outcome of FMEA.

Monitoring and evaluation 

QM Cockpit for Evaluations

Transaction QGA4.

Reporting

QA33 Inspection Lot Selection

Early Warning System

Some examples of where EWS can be used:
  • When quality specifications of material have exceeded a certain level
  • When the vendor often fails to deliver acceptable quality materials
  • When a vendor continues delivers late
  • When  production scrap happens more than the certain percent  of total production
  • When the inventory of precious metal exceeds a certain value

Configuration 

Organization - settings 

Client level: ALE distribution ( inspection characteristics, inspection method, code group )...
Plant level: document changes ( inspection characteristics, inspection method ), presetting lot creation, costs centers ( scrapping and destroying ), storage location for reserve, time for automatic UD.

QM in logistics 

  • Sales and Distribution: To control quality management in Sales and Distribution, the QM component contains an info record for the supply relationship, (that is for the object types customer or for the object types customer, sales organization and material).
  • Production: The settings described in the subsection 'Quality Planning' / 'Basic Data' also apply to the quality planning activities in production
  • Procurement: 
    • Control key (V_TQ08-QM_PUR): The control keys in the material master are defined at plant level.
      • Technical Delivery Terms Required
      • Quality Assurance Agreement Is Required
      • Vendor Release Required for Regular Delivery ( Quality info record for QM in procurement )
      • Certificate Required
        • With requests for quotations and purchase orders, the vendor is informed of the certificate requirement and certificate type.
        • At goods receipt, the system checks whether the receipt of a certificate has been already confirmed in the purchase order.
      • Block Invoice
      • GR Control for Rejected Source Inspection Lot (a goods receipt is allowed despite the above ? or Create new inspection lot )
    • Certification type ( V_TQ05-ZGTYP ) is to  control the statuses in the certificate profile, to remind and escalate
    • Delivery block: depending on whether the block applies to all materials or only certain materials for a vendor
    • QM system: A customer wants a vendor to verify the existence of a QM system that complies with standard ISO 9003. The vendor has a certificate that states that his system complies with ISO 9001, with an audit score > 80.
    • Status profile is assigne to the inspection type: specify that the delivery of a material from a vendor must pass through a number of statuses

Quality planning

  • Catalog
    • Catalog type ( Characteristic attributes Tasks, Usage decisions, Events, Causes, Results of defects, Activities (QM), Defect types, Activities (PM), Object parts, Overview of damage, Failure Mode, Defect Locations )
    • Defect class.
  • Inspection Characteristic, Inspection Method
    • copy models when you create inspection plans or material specifications.
      • Define Characteristic Weighting ( can it be skipped? )
      • Define Inspector Qualification
      • Define Tolerance Keys
      • Define Estimation Procedure for Fraction of Defects
    • Sampling: The sampling procedure is stored in the inspection plan for the inspection characteristic, or in the material for the inspection type
      • Sample determination
        • Sample type ( by schema, fixed, percentage )
        • Valuation mode:  how a decision is made to accept or reject inspection characteristics (valuation mode).  These decisions are used in the sampling procedure
    • Inspection planning
      • Assignment of the Task type to a material type 
      • Define task list usage (~ model inspections, goods receipt inspections, inspections for goods returned from a customer, product audits and goods issue inspections )  and assign DCR ( typical dynamic modification criteria for a goods receipt inspection are for example, material and vendor. The quality level is updated for these dynamic modification criteria after each goods receipt inspection)
      • Task list status 
      • Inspection planner groups ( inside a plant )
      • Profile with default values 
      • Field selection
      • Task list type parameters: number range
      • Multiple specifications: object type ( country, ustomer... class characteristics ) and possible values Canada, Germany...
      • Operation. Contorl key: Scheduling, Insp.char is requires,  Cost 
        • Work center: Qualifications
        • Inspection characteristics: Origin, Control method
      • Quality Score Procedure
      • Define follow up actions ->  FM
      • QM inventory postings with the usage decision ( mapping MvT):
        • Stock transfers (plant)
        • Stock transfers (StLoc)
        • To unrestricted use
        • To scrap
        • To sample
        • To blocked stock
        • To reserve samples
        • New material
        • Return delivery
      • Transfer Inspection Decision to Batch
        • LOBM_UDCODE (usage decision)
        • LOBM_QSCORE (quality score)

Quality inspection

  • Inspe ction type: Status profile, Order Type for QM Orders As Default Value for Insp. Type, Physical smaple type, UD selected set, notification type, One Q notification per inspection lot, Task list usage, Control key, Operation/Act 
  • Inspection types to Origins 
  • Default values for the inspection types
  • Inspection for goods movement: deactivate QM for a MvT
  • Inspection at Shipping: Assign Inspection Lot Origin to Delivery Type, Assign Inspection Type to Delivery Category
  • Define Quality Score Procedure

Result recording 

  • Recording configuration ( background functions for recording characteristic inspection results ) 
  • Origin of result data ( Test equipment, manual, certificate )
  • Make Settings for Copy of Inspection Results

Sample management

  • Physical sample type ( FM to print label, status profile )
  • Physical sample container 
  • Physical sample location 

Inspection lot origin

  • Goods Receipt
  • Goods Issue
  • Production
  • Goods Receipt from Production
  • Other Goods Receipt
  • Return from Customers
  • Vendor Audit
  • Stock Transfer
  • Recurring Inspection
  • Delivery to Customer with Customer Order
  • Delivery to Customer Without Sales Order
  • General Delivery
  • Repetitive Manufacturing
  • Plant Maintenance
  • Sample Management
  • Stability Study
  • Externally Triggered Inspection
  • Miscellaneous

Quality certificates

  • Create a certificate profile; in the profile, assign the sample form QM_CERT_01 (contained in the standard system) to the profile.
  • Release the certificate profile and assign it to the material.
  • Define the output dispatch ( LQCA ).
  • Create a delivery for the material.
  • Trigger the certificate dispatch for this delivery item.

Quality notifications

  • Notificatio type: notification category, notification origin, catalog profile, update group.
  • Define screen layout 
  • Catalogs and Catalog Profiles for Notification Type
  • Define Partner Determination Procedures
  • Additional Notification Functions ( action box )
  • Status management
  • Digital signature
  • Costing parameters ( notification type - cost center )

Defects recordering

  • Confirmation profile 
  • Notification type to inspection type 

Comments